No |
Client |
Agent / Main Contractor |
Description |
Years |
94 |
Panglima Power Sdn Bhd |
ExPG |
Supply of Port Glass For HP Drum, Online Residual Chlorine Analyser Parts and Infrared Sightglass. |
2006 |
95 |
Tepat Teknik Sdn Bhd |
ExPG |
E&I Package for F13 Gas Dehydration and Glycol Regeneration System (Sarawak Shell Project). |
2006 |
96 |
Black, Sivalls & Bryson (AP) Sdn Bhd |
ExPG |
To Design, Fabricate and Supply of Pressure Vessel for Still Column. |
2006 |
97 |
Panglima Power Sdn Bhd |
ExPG |
Supply of Ardetem DIP404 Transducer and New Port IDP Transducer, Ardertem Transducer, Voltage Transformer and Current Collector Brush. |
2006 |
98 |
Wesmount Power (Kenya) Limited |
Syarikat Steelcon Sdn. Bhd. |
Supply of spare parts, rotor vanes and turbine blades for W251B11 Gas Turbine. |
2005 |
99 |
Muhibbah Marine Engineering Sdn. Bhd. |
Millennium Woods Sdn. Bhd. |
Design and Supply of Cooling Coil / Heat Exchanger for newly fabricated Tug Boat. |
2005 |
100 |
AmSteel Mills Sdn. Bhd. |
ExPG |
Design, Supply, Install, Testing and Commissioning of HDG Bolted Tank at Bukit Raja. |
2005 |
101 |
Siemens Malaysia Sdn. Bhd. (PG) |
ExPG |
Supply services for Hydrostatic Test for 2 nos of Condenser Ball Collector Vessels installed at Panglima Power Melaka. Including full liaison with DOSH to obtain CFs. |
2005 |
102 |
Putrajaya GDC Plant |
SAAG Oil & Gas Sdn. Bhd. |
To decommission, dismantle, service, reinstall and Commissioning of control and shut off valves. |
2005 |
103 |
Siemens Power Generation |
ExPG |
Supply and Install the Conductor sensor and DP detector for Townsville and Carry out repair for Condenser Ball Collectors and carry out HT to obtain CF from DOSH |
2005 |
104 |
Emerson Process (M) Sdn Bhd |
ExPG |
Supply & Install E&I Work For JT International Factory At Shah Alam. |
2005 |
105 |
Panglima Power Sdn Bhd |
ExPG |
Cathodic Protection Inspection for protected water intake, pipe and condenser water box and Supply of Port Glass For HP Drum. |
2005 |
106 |
Panglima Power Sdn Bhd |
ExPG |
Design, Supply, Install and Testing the Hydraulic pump for Bolt Stretching Device. |
2005 |
107 |
Siemens Malaysia Sdn Bhd |
ExPG |
Supply Mechanical Specialist to Petronas, Bintulu for Inspection & Troubleshooting of Burner. |
2005 |
108 |
Siemens Power Generation |
ExPG |
Design, Supply & Install Bar Screen Steel Support Structure. |
2005 |
109 |
GDC KLIA |
SAAG Oil & Gas Sdn Bhd |
To Decommission, Dismantle, Re-tubing, Reinstall And Testing & Commissioning of high stage Generator at GDC KLIA Plant. |
2005 |
110 |
Air Product STB Sdn Bhd |
ExPG |
Troubleshoot; Reinstall the Heat Exchanger and Hydro Test & Witness by LLOYDS. |
2005 |
111 |
Siemens Power Generation A/P |
ExPG |
Design, Fabricate, Supply, Install and Erect the stop lock stand |
2005 |
112 |
Panglima Power Sdn Bhd |
ExPG |
Supply of Allweiler Screw Type Pump for Germany. |
2005 |
113 |
Panglima Power Sdn Bhd |
ExPG |
Supply Of SAACKE Burner Parts, TURCK Switching Amplifier, Hydraulic Filter and Pilot Gas Filter. |
2005 |