No Client Agent / Main Contractor Description Years
34 Powertek Berhad ExPG TG1 & TG2 Anti-Corrosion Work Manpower Supply 2010
35 Ranhill Powertron Sdn Bhd Ex PG Supply & Deliver of Servo Valve Control Valve Kits at Teluk Salut Power Station. 2010
36 Powertek  Berhad ExPG Supply material, Labour, Tools, Transportation and All Necessary to Fabricate and Perform Interconnection between TG1 and TG2 Fire Fighting Pipeline according to Approved Design and Drawing by BOMBA. 2010
37 Regal Elite Elektrik Sdn Bhd ExPG Supply, Install, Lay, Erect, Test and Commissioning of 33KV Distribution System for Phase 1 of Stainless Steel Integrated Plant at Tanjung Langsat, Pasir Gudang, Johor Bahru Stainless Sdn Bhd. - I&C Package 2010
38 Prosep AP Sdn Bhd ExPG Supply, Delivery and Installation of Electrical & Instrumentation for J-1994 Tangga Barat Produced Water Treatment Skid. 2010
39 Prosep AP Sdn Bhd ExPG Supply, Delivery and Installation of Electrical & Instrumentation for J-1994 Gemusut Kakap Project Kuantan. 2010
40 Pahlawan Power Sdn Bhd ExPG Supply of SIPART Positioner C/W Sensor,Wika differential pressure gauge and outdoor flood light. 2010
41 Panglima Power Sdn Bhd ExPG Supply and Deliver of Transformer Radiator Cell Disc coupling SX225-6 and ASAHI Valve 4” constant Flow Valve. 2010
42 Prosep AP Sdn Bhd ExPG Supply, Delivery and Installation of Electrical & Instrumentation for J-1994 Gemusut Kakap Project Kuantan. 2010
43 Alfa Laval (Malaysia) Sdn Bhd ExPG Preliminary Inspection for the Ex-Proof Control Panel Pressure Switch & Flow Control Valve. 2010
44 Prosep AP Sdn Bhd ExPG Supply, Delivery and Installation of Electrical & Instrumentation for J-1994 Gemusut Kakap Project Kuantan. 2010
45 Air Products Malaysia Sdn Bhd ExPG SS Duplex Modification Works on Condensate Pipe Line at Westport. 2010
46 Prosep AP Sdn Bhd ExPG Carry out repair work of Electrical & Instrumentation Package for J-1994 Gemusut Kakap Project Kuantan. 2010
47 Air Products Malaysia Sdn Bhd -  West Port ExPG E2103 Hot Spot Convection Box and E2123 Steam Coil Top Plate and supply test kit flow Hydrogen cylinder to caloric. 2010
48 Panglima Power Sdn Bhd ExPG Cathodic Protection System Annual Assessment  for Combine Cycle Cooling Water System 2010
49 Jutasama Sdn Bhd ExPG Supply and Installation of E&I Works for PSA Unit for 10-Bed Poly Bed PSA Unit. 2010
50 Air Products Malaysia Sdn Bhd – West Port ExPG Additional Works During TAR 2010 Repair Works at Westport. (E2122 & E2123) 2010
51 Air Products Malaysia Sdn Bhd – Banting ExPG Pipe Modification Works At Hydrogen Plant – BFW Preheater, Syngas cooler and steam Drum at west Port. 2010
52 Prosep AP Sdn Bhd ExPG E&I Package including Pre-Testing for L-2005 Chemical Injection Package. 2010
53 Air Products Malaysia Sdn Bhd ExPG Design & Remodification Works on 6” pipe, c/w Fabrication of Inconel 800 HT Pipe at Air Products Kuantan. 2009
 
New 1 2 3 4 5 6 7