No |
Client |
Agent / Main Contractor |
Description |
Years |
54 |
Powertek Berhad |
ExPG |
TG1 & TG2 Anti-Corrosion Work Manpower Supply |
2009 |
55 |
Air Products (M) Sdn Bhd |
ExPG |
Carry out Repair Works on Tube Bundle Plate and Vertical Boiler Casing at Air Products, West Port. |
2009 |
56 |
Genting Sanyen Power Sdn Bhd |
ExPG |
Design and Construction of Submerge Underground Reinforced Concrete Tank to Capacity of 500m3. |
2009 |
57 |
Red Energy Sdn Bhd |
ExPG |
Carry Out Hydro Tests for Air Receiver Tank including Obtain Design Approval and Certificate of Fitness From DOSH at Bahau, Negeri Sembilan. |
2009 |
58 |
Unit Concept Sdn Bhd |
ExPG |
Carry Out E&I Installation Works for Chemical Injection Skid including Installation of Cable Tray, Cables, Tubings and Junction Box c/w Testing. |
2009 |
59 |
Panglima Power Sdn Bhd |
ExPG |
To Supply A Complete Set of Circular Sight Glass, Klinger Transparent Glass and Bonetti Level Gauge Glass. |
2009 |
60 |
Stesen Janaelektrik Gelugor (TNB) |
ExPG |
Complete Fabrication of 1 Unit Lube Oil Cooler for Gas Turbine including Complete Factory Acceptance Test (FAT) at Gelugor Power Station. |
2009 |
61 |
Petrotechnic Oilwell Sdn Bhd |
ExPG |
Supply and Installation of Complete E&I Works for Glycol Contactor And Heat Exchanger Package. |
2009 |
62 |
Boustead Penang Shipyard |
Pembinaan SPPH Sdn Bhd |
Design, Supply, Fabricate & Installation of a Complete Steam Boiler System & Air Compressor System for Pyrotechnical ordinance Malaysia Sdn Bhd Bentong Industrial Park Phase 2B. |
2009 |
63 |
Tos Energy (M) Sdn Bhd |
ExPG |
Fabrication, Supply & Delivery of Mesh Panel Frame for Intake Screen System at Tanjung Bin Power Plant. |
2009 |
64 |
Tepat Teknik Sdn Bhd |
ExPG |
To Supply Labour, materials, Tools and Equipment To Carry Out Cabling and Termination Works in accordance with the documents during shutdown at Sepangar Bay 100MW Gas Fired Power Plant in Sabah. |
2009 |
65 |
Air Product Malaysia Sdn Bhd |
EXPG |
Conducting HT on E1 Steam Boiler and Installation of 4”Nozzle on the Exhaust Stack |
2008 |
66 |
Air Product Malaysia Sdn Bhd |
EXPG |
Conducting HT on E1 Steam Boiler and Installation of 4”Nozzle on the Exhaust Stack – Additional Job (VO). |
2008 |
67 |
Tos Energy (M) Sdn Bhd |
EXPG |
Supply, Fabrication, Coating and Delivery of GRP Floor Drain Pipe Support for JIMAH Project. |
2008 |
68 |
Panglima Power Sdn bhd |
EXPG |
Supply Cathodic Protection Spare Parts - Rectifier Modules 15V/10A Control. |
2008 |
69 |
MKR Consortium Sdn Bhd |
EXPG |
Supply, Design and Fabricate KTM Train Jacking Stand |
2008 |
70 |
Panglima Power Sdn Bhd |
EXPG |
Cathodic Protection Inspection -Supply Specialist & all Necessary Equipment to successfully carryout for Inspection & Submission of Final Report. |
2008 |
71 |
MSI Asia Pacific Sdn Bhd |
EXPG |
Fuel Oil Unloading Facility, Shuqaiq II Saudi Arabia - Provision of Engineering Consultancy Services and Site Supervision Servicers. |
2008 |
72 |
Panglima Power Sdn Bhd |
EXPG |
Supply & delivery of ARGUS Ball Valve and Schunk Grounding Brush Holder. |
2008 |
73 |
MKR Consortium Sdn Bhd |
EXPG |
Supply and Install Safety Floorings for KTM Trains |
2008 |