No Client Agent / Main Contractor Description Years
54 Powertek Berhad ExPG TG1 & TG2 Anti-Corrosion Work Manpower Supply 2009
55 Air Products (M) Sdn Bhd ExPG Carry out Repair Works on Tube Bundle Plate and Vertical Boiler Casing at Air Products, West Port. 2009
56 Genting Sanyen Power Sdn Bhd ExPG Design and Construction of Submerge Underground Reinforced Concrete Tank to Capacity of 500m3.  2009
57 Red Energy Sdn Bhd ExPG Carry Out Hydro Tests for Air Receiver Tank including Obtain Design Approval and Certificate of Fitness From DOSH at Bahau, Negeri Sembilan. 2009
58 Unit Concept Sdn Bhd ExPG Carry Out E&I Installation Works for Chemical Injection Skid including Installation of Cable Tray, Cables, Tubings and Junction Box c/w Testing. 2009
59 Panglima Power Sdn Bhd ExPG To Supply A Complete Set of Circular Sight Glass, Klinger Transparent Glass and Bonetti Level Gauge Glass. 2009
60 Stesen Janaelektrik Gelugor (TNB) ExPG Complete Fabrication of 1 Unit Lube Oil Cooler for Gas Turbine including Complete Factory Acceptance Test (FAT) at Gelugor Power Station. 2009
61 Petrotechnic Oilwell Sdn Bhd ExPG Supply and Installation of Complete E&I Works for Glycol Contactor And Heat Exchanger Package. 2009
62 Boustead Penang Shipyard Pembinaan SPPH Sdn Bhd Design, Supply, Fabricate & Installation of a Complete Steam Boiler System & Air Compressor System for Pyrotechnical ordinance Malaysia Sdn Bhd Bentong Industrial Park Phase 2B. 2009
63 Tos Energy (M) Sdn Bhd  ExPG Fabrication, Supply & Delivery of Mesh Panel Frame for Intake Screen System at Tanjung Bin Power Plant. 2009
64 Tepat Teknik Sdn Bhd ExPG To Supply Labour, materials, Tools and Equipment To Carry Out Cabling  and Termination Works in accordance with the documents during shutdown at Sepangar Bay 100MW Gas Fired Power Plant in Sabah. 2009
65 Air Product Malaysia Sdn Bhd EXPG Conducting HT on E1 Steam Boiler and Installation of 4”Nozzle on the Exhaust Stack 2008
66 Air Product Malaysia Sdn Bhd EXPG Conducting HT on E1 Steam Boiler and Installation of 4”Nozzle on the Exhaust Stack – Additional Job (VO). 2008
67 Tos Energy (M) Sdn Bhd EXPG Supply, Fabrication, Coating and Delivery of GRP Floor Drain Pipe Support for JIMAH Project. 2008
68 Panglima Power Sdn bhd EXPG Supply Cathodic Protection Spare Parts - Rectifier Modules 15V/10A Control. 2008
69 MKR Consortium Sdn Bhd EXPG Supply, Design and Fabricate KTM Train Jacking Stand 2008
70 Panglima Power Sdn Bhd EXPG Cathodic Protection Inspection -Supply Specialist & all Necessary Equipment to successfully carryout for Inspection & Submission of Final Report. 2008
71 MSI Asia Pacific Sdn Bhd EXPG Fuel Oil Unloading Facility, Shuqaiq II Saudi Arabia - Provision of Engineering Consultancy Services and Site Supervision Servicers. 2008
72 Panglima Power Sdn Bhd EXPG Supply & delivery of ARGUS Ball Valve and Schunk Grounding Brush Holder. 2008
73 MKR Consortium Sdn Bhd EXPG Supply and Install Safety Floorings for KTM Trains 2008
 