No |
Client |
Agent / Main Contractor |
Description |
Years |
74 |
Panglima Power Sdn Bhd |
EXPG |
Supply of Balston Filter Cartridge for Oil Mist Eliminator for GE MS9171E Gas Turbine, Ingersoll Rand Refrigerator Air Dryer and RIVI Gear Pump |
2008 |
75 |
TOS Energy Sdn Bhd |
EXPG |
Design, Fabricate and Supply of GT Rotor Stand, GT Inlet Air Filter Removal Basket & GT Jacking Stand for Tuanku Jaafar Power Station Phase 2. |
2008 |
76 |
Air Products Malaysia Sdn Bhd |
EXPG |
Design & Remodification Works on 8” pipe, c/w Fabrication of Spool and Reinforcement Pad. |
2008 |
77 |
SMEC Malaysia Sdn Bhd |
EXPG |
KINA/SEGUNTOR 11.5 MW BIOMASS POWER PLANT PROJECT, SANDAKAN, SABAH - Provision of Technical Consultancy. |
2008 |
78 |
MKR Consortium Sdn Bhd |
EXPG |
Supply & Install Self Adhesive Sticker 3M for 17 EMUs (KTMB Project). |
2008 |
79 |
Powertek Berhad |
EXPG |
Design, Supply and Installation of Industronic GT2B CO2 Control Panel at TG2. (Upgrading Works). |
2008 |
80 |
Samsung C&T, Singapore |
ExPG |
Supply of Piping Material for Tank Piping System, Demin Water Line and Terminal Point at Seraya Power. |
2008 |
81 |
Siemens Site Office, Melaka |
Syarikat Steelcon Sdn. Bhd. |
Fabrication, Installation, Replacement and Supply Man Power for New Air Line to Generator Room & New Service Air Line, Replacement Tread Joints to Weld Joint for Control Cabin Air Compress Airline, Remove & Replace 2 Units of PGB Motor and Constant Spring Hanger Adjustment. |
2007 |
82 |
Panglima Power Sdn Bhd |
ExPG |
Carry out Inspection for Cathodic Protection System & Cathodic Protection System for Water Box Condenser. |
2007 |
83 |
Samsung Corning (M) Sdn Bhd |
EXPG |
Supply and Carry Out NG/LPG Gas Line Isolation at Boiler Area. |
2007 |
84 |
Becker Vietnam (Paint Manufacturer) |
EXPG |
JV Project with IEC for machine installation, small lighting & power and Fire Fighting System. |
2007 |
85 |
Jord Malaysia Sdn Bhd |
ExPG |
E & I Package for Water Cooler at JORD. |
2007 |
86 |
Tepat Teknik Sdn Bhd |
ExPG |
E&I Package including Calibration & Testing of Instruments at Sepangar Bay 100MW Gas Fired Power Plant – Phase 2 |
2007 |
87 |
Tos Energy (M) Sdn Bhd |
EXPG |
JIMAH 2 x 700MW Coal Fired Power Plant – Carried out Fabrication works of Drain Funnels and Misc Item and Supply of PVC Pipes and Fittings. |
2007 |
88 |
Tos Energy (M) Sdn Bhd |
ExPG |
Supply Fabricated Steel Material for Electrochlorination System. |
2007 |
89 |
Tepat Teknik Sdn Bhd |
ExPG |
E&I Package for Nitrogen Generation Skid for Murphy Oil Sabah |
2006 |
90 |
Siemens Site Office, Melaka |
ExPG |
Site Service Contract for Warranty – Manage and coordinate complete power plant issues throughout the warranty period on behalf of Siemens Power Generation. |
2006 |
91 |
Jord International Pte Ltd |
ExPG |
Supply Electrical Material For Water Cooler. |
2006 |
92 |
Panglima Power Sdn Bhd |
ExPG |
Supply of Fukui Complete Valve and Spare Parts From Japan. |
2006 |
93 |
TOS Energy Malaysia Sdn Bhd |
EXPG |
Design, Supply & Commissioning of Impressed Current Cathodic Protection System for Cooling Water Cycle for Tuanku Jaafar Power Station Port Dickson Rehabilitation Project Phase 2. |
2006 |