top of page
OUR PROJECTS
We Build Projects
That Last
Client | Description | Year |
|---|---|---|
VME Process / Talisman | Supply and install and pre-commissioning of E&I components for Talisman Bunga Raya E – offshore Condensate Reboiler Package. | 2004 |
S.A. Asia Pacific Sdn. Bhd. | Design, Fabricate, Supply and Installation of Heavy-Duty Control Cabins (Proposal Stage) | 2004 |
AmBank | Bright 27 Energy Saver for office lighting. | 2004 |
Tanjung Bin | Design of cable trays, ladders, and ducts for Tanjung Bin Power Plant (Proposal Stage). | 2004 |
Putrajaya Holdings | Design, supply, and air conditioning ducting system for bowling alleys in Putrajaya. | 2004 |
AP Komuniti Sdn. Bhd. | Design, supply, installation of Electrical and Ventilation and install Air Conditioning systems. | 2004 |
Hitachi Plant Engineering | Aeration Acoustic | 2004 |
FPG – Kuantan | Design, Supply, Install, Testing and Commissioning of Additional Cooling Tower Cell | 2004 |
Panglima Power Plant Melaka | Design, Supply, Install and Commissioning of Cooling Water Intake Pit Dewatering Pumping System. | 2004 |
PPMSB (Melaka Refinery) | Machining and Retrofitting of Hydrogen Gas Compressor Inner Liner. | 2004 |
Siemens Power Generation Asia Pacific | Power Plant Operation Manual Preparation in softcopy | 2004 |
Siemens Power Generation Asia Pacific | Design, supply, installation, testing and commissioning of Explosion Proof Lightings and switches and Submersible Pump for Panglima Power Plant, Melaka.
| 2004 |
Siemens Power Generation Asia Pacific | Design and supply of MBL Two-Wire System SITRANS pressure transmitters. | 2004 |
Black, Sivalls & Bryson (AP) Sdn Bhd | To design, Fabricate and Supply of complete J-828 Vertical J-Treater Package to separate Hydrocarbon for Pertamina, Indonesia. | 2005 |
GDC KLIA | To Decommission, Dismantle, Re-tubing, Reinstall and Testing & Commissioning of high stage Generator at GDC KLIA Plant. | 2005 |
Panglima Power Sdn Bhd | Supply Of SAACKE Burner Parts, TURCK Switching Amplifier, Hydraulic Filter and Pilot Gas Filter. | 2005 |
Panglima Power Sdn Bhd | Design, Supply, Install and Test the Hydraulic pump for Bolt Stretching Device. | 2005 |
AmSteel Mills Sdn. Bhd. | Design, Supply, Install, Testing and Commissioning of HDG Bolted Tank at Bukit Raja. | 2005 |
Panglima Power Sdn Bhd | Supply of Ardetem DIP404 Transducer and New Port IDP Transducer, Ardertem Transducer, Voltage Transformer and Current Collector Brush. | 2006 |
Black, Sivalls & Bryson (AP) Sdn Bhd | To Design, Fabricate and Supply of Pressure Vessel for Still Column. | 2006 |
APC Holding | Compressed Dry Air System | 2006 |
Tepat Teknik Sdn Bhd | E & I work for the F13 Gas Dehydration and Glycol Regeneration System (Sarawak Shell Project). | 2006 |
TOS Energy Malaysia Sdn Bhd | Impressed Current Cathodic Protection System. | 2006 |
TOS Energy Malaysia Sdn Bhd | Design, Supply & Commissioning of Cooling Water Cycle for Tuanku Jaafar Power Station Port Dickson Rehabilitation Project Phase 2. | 2006 |
Siemens Site Office, Melaka | Site Service Contract for Warranty – Manage and coordinate complete power plant issues throughout the warranty period on behalf of Siemens Power Generation. | 2006 |
Tos Energy (M) Sdn Bhd | JIMAH 2 x 700MW Coal-Fired Power Plant – Carried out Fabrication works of Drain Funnels and Misc. Item and Supply of PVC Pipes and Fittings. | 2007 |
Tepat Teknik Sdn Bhd | Sepangar Bay 100MW Gas-Fired Power Plant – Phase 2, Supply Manpower for Instrumentation Work. | 2007 |
Siemens Site Office, Melaka | Airline works to generator and control cabin, PGB motor replacement (2 units), and spring hanger adjustment. | 2007 |
Samsung C&T, Singapore | Supply of Piping Material for Tank Piping System, Demin Water Line and Terminal Point at Seraya Power. | 2008 |
Powertek Berhad | Design, Supply, and Installation of Industries GT2B CO2 Control Panel at TG2. (Upgrading Works). | 2008 |
MKR Consortium Sdn Bhd | Supply & Install Self Adhesive Sticker 3M for 17 EMUs (KTMB Project). | 2008 |
SMEC Malaysia Sdn Bhd | Provision of Technical Consultancy. | 2008 |
SMEC Malaysia Sdn Bhd | KINA/SEGUNTOR 11.5 MW BIOMASS POWER PLANT PROJECT, SANDAKAN, SABAH | 2008 |
TOS Energy Sdn Bhd | Design, Fabricate and Supply of GT Rotor Stand, GT Inlet Air Filter Removal Basket & GT Jacking Stand for Tuanku Jaafar Power Station Phase 2. | 2008 |
MINCES | CO2 Compressor | 2008 |
MKR Consortium Sdn Bhd | Supply and Install of ALTRO & FORBO Safety Floorings for 2 EMUs. | 2008 |
MSI Asia Pacific Sdn Bhd | Fuel Oil Unloading Facility, Shuqaiq II Saudi Arabia. Provision of Engineering Consultancy Services and Site Supervision Servicers. | 2008 |
Tos Energy (M) Sdn Bhd | Fabrication, Supply & Delivery of Mesh Panel Frame for Intake Screen System at Tanjung Bin Power Plant. | 2009 |
Boustead Penang Shipyard | Design, Supply, Fabricate &Installation of a Complete Steam Boiler System & Air Compressor System for Pyrotechnical ordinance | 2009 |
Petrotechnic Oilwell Sdn Bhd | Supply and Installation of Complete E&I Works for Glycol Contactor and Heat Exchanger Package. | 2009 |
Stesen Jana Elektrik Gelugor (TNB) | Complete Fabrication of 1 Unit Lube Oil Cooler for Gas Turbine including Complete Factory Acceptance Test (FAT) at Gelugor Power Station. | 2009 |
Genting Sanyen Power Sdn Bhd | Design and Construction of Submerge Underground Reinforced Concrete Tank to Capacity of 500m3. | 2009 |
Air Products (M) Sdn Bhd | Carry out Repair Works on Tube Bundle Plate and Vertical Boiler Casing at Air Products, West Port. | 2009 |
Panglima Power Sdn Bhd | Supply of Cation Filter Sampling System. | 2009 |
Powertek Berhad | TG1 & TG2 Manpower Anti-Corrosion Work. | 2009 |
Air Products Malaysia Sdn Bhd | Design & Re-modification Works on 6” pipe, c/w Fabrication of Inconel 800 HT Pipe at Air Products Kuantan. | 2009 |
Client | Description | Year |
|---|---|---|
VME Process / Talisman | Supply and install and pre-commissioning of E&I components for Talisman Bunga Raya E – offshore Condensate Reboiler Package. | 2004 |
S.A. Asia Pacific Sdn. Bhd. | Design, Fabricate, Supply and Installation of Heavy-Duty Control Cabins (Proposal Stage) | 2004 |
AmBank | Bright 27 Energy Saver for office lighting. | 2004 |
Tanjung Bin | Design of cable trays, ladders, and ducts for Tanjung Bin Power Plant (Proposal Stage). | 2004 |
Putrajaya Holdings | Design, supply, and air conditioning ducting system for bowling alleys in Putrajaya. | 2004 |
AP Komuniti Sdn. Bhd. | Design, supply, installation of Electrical and Ventilation and install Air Conditioning systems. | 2004 |
Hitachi Plant Engineering | Aeration Acoustic | 2004 |
FPG – Kuantan | Design, Supply, Install, Testing and Commissioning of Additional Cooling Tower Cell | 2004 |
Panglima Power Plant Melaka | Design, Supply, Install and Commissioning of Cooling Water Intake Pit Dewatering Pumping System. | 2004 |
PPMSB (Melaka Refinery) | Machining and Retrofitting of Hydrogen Gas Compressor Inner Liner. | 2004 |
Siemens Power Generation Asia Pacific | Power Plant Operation Manual Preparation in softcopy | 2004 |
Siemens Power Generation Asia Pacific | Design, supply, installation, testing and commissioning of Explosion Proof Lightings and switches and Submersible Pump for Panglima Power Plant, Melaka.
| 2004 |
Siemens Power Generation Asia Pacific | Design and supply of MBL Two-Wire System SITRANS pressure transmitters. | 2004 |
Black, Sivalls & Bryson (AP) Sdn Bhd | To design, Fabricate and Supply of complete J-828 Vertical J-Treater Package to separate Hydrocarbon for Pertamina, Indonesia. | 2005 |
GDC KLIA | To Decommission, Dismantle, Re-tubing, Reinstall and Testing & Commissioning of high stage Generator at GDC KLIA Plant. | 2005 |
Panglima Power Sdn Bhd | Supply Of SAACKE Burner Parts, TURCK Switching Amplifier, Hydraulic Filter and Pilot Gas Filter. | 2005 |
Panglima Power Sdn Bhd | Design, Supply, Install and Test the Hydraulic pump for Bolt Stretching Device. | 2005 |
AmSteel Mills Sdn. Bhd. | Design, Supply, Install, Testing and Commissioning of HDG Bolted Tank at Bukit Raja. | 2005 |
Panglima Power Sdn Bhd | Supply of Ardetem DIP404 Transducer and New Port IDP Transducer, Ardertem Transducer, Voltage Transformer and Current Collector Brush. | 2006 |
Black, Sivalls & Bryson (AP) Sdn Bhd | To Design, Fabricate and Supply of Pressure Vessel for Still Column. | 2006 |
APC Holding | Compressed Dry Air System | 2006 |
Tepat Teknik Sdn Bhd | E & I work for the F13 Gas Dehydration and Glycol Regeneration System (Sarawak Shell Project). | 2006 |
TOS Energy Malaysia Sdn Bhd | Impressed Current Cathodic Protection System. | 2006 |
TOS Energy Malaysia Sdn Bhd | Design, Supply & Commissioning of Cooling Water Cycle for Tuanku Jaafar Power Station Port Dickson Rehabilitation Project Phase 2. | 2006 |
Siemens Site Office, Melaka | Site Service Contract for Warranty – Manage and coordinate complete power plant issues throughout the warranty period on behalf of Siemens Power Generation. | 2006 |
Tos Energy (M) Sdn Bhd | JIMAH 2 x 700MW Coal-Fired Power Plant – Carried out Fabrication works of Drain Funnels and Misc. Item and Supply of PVC Pipes and Fittings. | 2007 |
Tepat Teknik Sdn Bhd | Sepangar Bay 100MW Gas-Fired Power Plant – Phase 2, Supply Manpower for Instrumentation Work. | 2007 |
Siemens Site Office, Melaka | Airline works to generator and control cabin, PGB motor replacement (2 units), and spring hanger adjustment. | 2007 |
Samsung C&T, Singapore | Supply of Piping Material for Tank Piping System, Demin Water Line and Terminal Point at Seraya Power. | 2008 |
Powertek Berhad | Design, Supply, and Installation of Industries GT2B CO2 Control Panel at TG2. (Upgrading Works). | 2008 |
MKR Consortium Sdn Bhd | Supply & Install Self Adhesive Sticker 3M for 17 EMUs (KTMB Project). | 2008 |
SMEC Malaysia Sdn Bhd | Provision of Technical Consultancy. | 2008 |
SMEC Malaysia Sdn Bhd | KINA/SEGUNTOR 11.5 MW BIOMASS POWER PLANT PROJECT, SANDAKAN, SABAH | 2008 |
TOS Energy Sdn Bhd | Design, Fabricate and Supply of GT Rotor Stand, GT Inlet Air Filter Removal Basket & GT Jacking Stand for Tuanku Jaafar Power Station Phase 2. | 2008 |
MINCES | CO2 Compressor | 2008 |
MKR Consortium Sdn Bhd | Supply and Install of ALTRO & FORBO Safety Floorings for 2 EMUs. | 2008 |
MSI Asia Pacific Sdn Bhd | Fuel Oil Unloading Facility, Shuqaiq II Saudi Arabia. Provision of Engineering Consultancy Services and Site Supervision Servicers. | 2008 |
Tos Energy (M) Sdn Bhd | Fabrication, Supply & Delivery of Mesh Panel Frame for Intake Screen System at Tanjung Bin Power Plant. | 2009 |
Boustead Penang Shipyard | Design, Supply, Fabricate &Installation of a Complete Steam Boiler System & Air Compressor System for Pyrotechnical ordinance | 2009 |
Petrotechnic Oilwell Sdn Bhd | Supply and Installation of Complete E&I Works for Glycol Contactor and Heat Exchanger Package. | 2009 |
Stesen Jana Elektrik Gelugor (TNB) | Complete Fabrication of 1 Unit Lube Oil Cooler for Gas Turbine including Complete Factory Acceptance Test (FAT) at Gelugor Power Station. | 2009 |
Genting Sanyen Power Sdn Bhd | Design and Construction of Submerge Underground Reinforced Concrete Tank to Capacity of 500m3. | 2009 |
Air Products (M) Sdn Bhd | Carry out Repair Works on Tube Bundle Plate and Vertical Boiler Casing at Air Products, West Port. | 2009 |
Panglima Power Sdn Bhd | Supply of Cation Filter Sampling System. | 2009 |
Powertek Berhad | TG1 & TG2 Manpower Anti-Corrosion Work. | 2009 |
Air Products Malaysia Sdn Bhd | Design & Re-modification Works on 6” pipe, c/w Fabrication of Inconel 800 HT Pipe at Air Products Kuantan. | 2009 |
Let's Work
Together
ExPG Engineering Sdn. Bhd.
(COMPANY NO: 641967-D)
Level 3-06, Plaza Seri Setia
No 1, Jalan SS9/2, Seri Setia
47300 Petaling Jaya, Selangor
Phone: 03 – 78745212 / 5242
Fax: 03- 7874 5028
Email: mailbox@expg.com.my
bottom of page

